1
/
of
12
Disney Toy Story Dog Retractable Lead for Small Dogs | Lightweight Locking Automatic Lead Long Lead Retractable Walking Outings Stylish Fashionable Cute 3m
Disney Toy Story Dog Retractable Lead for Small Dogs | Lightweight Locking Automatic Lead Long Lead Retractable Walking Outings Stylish Fashionable Cute 3m
Regular price
$68.50
Regular price
Sale price
$68.50
Unit price
/
per
| size |
Body: 13.3cm wide x 10.8cm long x 2.8cm thick Lead length: 3m |
| Suitable weight | Up to 12kg |
| material | Body: ABS resin Drawstring: Nylon Lock button: Polyacetal Snap hook: Zinc alloy |
| Note |
[About collars, leashes, and harnesses] These dog gear are for walking, so please do not use them for tethering. *Please read the precautions for use carefully to ensure safe use. |
Tax included.
Shipping calculated at checkout.
| size |
Body: 13.3cm wide x 10.8cm long x 2.8cm thick Lead length: 3m |
| Suitable weight | Up to 12kg |
| material | Body: ABS resin Drawstring: Nylon Lock button: Polyacetal Snap hook: Zinc alloy |
| Note |
[About collars, leashes, and harnesses] These dog gear are for walking, so please do not use them for tethering. *Please read the precautions for use carefully to ensure safe use. |
Couldn't load pickup availability
FREE SHIPPING ON ALL ORDERS OVER $150 WITHIN VICTORIA*
IN STORE CLICK AND COLLECT AVAILABLE
Measurements in size chart.
Metro Areas
Typically delivery times:
- Melbourne Metro areasL approx 2 - 3 business days.
- Interstate Metro areasL approx 3 - 5 business days.
Please note, before we could accept any returns, you must contact us with your order details.No change of mind/exchanges on sizing & SALE items. All apparel and accessories have measurements provided with the product.

Recently Viewed
Best Sellers
-
$6.95
-
$20.00
-
$41.50
-
$35.50
-
$3.00
-
$22.00
-
$19.00
-
$14.50
-
$3.00