1
/
/
12
Disney Toy Story Dog Retractable Lead for Small Dogs | Lightweight Locking Automatic Lead Long Lead Retractable Walking Outings Stylish Fashionable Cute 3m
Disney Toy Story Dog Retractable Lead for Small Dogs | Lightweight Locking Automatic Lead Long Lead Retractable Walking Outings Stylish Fashionable Cute 3m
常规价格
$68.50
常规价格
促销价
$68.50
单价
/
单价
size |
Body: 13.3cm wide x 10.8cm long x 2.8cm thick Lead length: 3m |
Suitable weight | Up to 12kg |
material | Body: ABS resin Drawstring: Nylon Lock button: Polyacetal Snap hook: Zinc alloy |
Note |
[About collars, leashes, and harnesses] These dog gear are for walking, so please do not use them for tethering. *Please read the precautions for use carefully to ensure safe use. |
含税费。
结账时计算的运费。
size |
Body: 13.3cm wide x 10.8cm long x 2.8cm thick Lead length: 3m |
Suitable weight | Up to 12kg |
material | Body: ABS resin Drawstring: Nylon Lock button: Polyacetal Snap hook: Zinc alloy |
Note |
[About collars, leashes, and harnesses] These dog gear are for walking, so please do not use them for tethering. *Please read the precautions for use carefully to ensure safe use. |
无法加载取货服务可用情况

维多利亚州内所有订单超过 120 美元免运费*

可在店内点击并提货
Measurements in size chart.
Metro Areas
Typically delivery times:
- Melbourne Metro areasL approx 2 - 3 business days.
- Interstate Metro areasL approx 3 - 5 business days.
Please note, before we could accept any returns, you must contact us with your order details.No change of mind/exchanges on sizing & SALE items. All apparel and accessories have measurements provided with the product.











最近浏览过的
最畅销
-
$34.50
-
$16.50
-
$6.95
-
$3.00
-
$22.00
-
$19.00
-
$14.50
-
$3.00
-
$22.95
-
$17.95
-
$12.80
-
$12.80
-
$20.00
-
$41.50
-
$35.50